CPS Energy’s offices, customer service centers, and call centers will be closed on Monday, January 20, 2025 in observance of Martin Luther King Jr Day. Offices will reopen on Tuesday, January 21 at 7:45AM. Customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 anytime. Online services may be conveniently accessed through Manage My Account (MMA).
Eastside Switchyard Project
Open House Links
- Eastside Open House Invite Letter
- Carta de Invitación a la Reunión Pública de Eastside Station
- Eastside Project Brochure
- Folleto del proyecto Eastside Station
- Study Area Map (PDF, 1.6MB)
- Eastside Switchyard Project Open House Displays
- Eastside Switchyard Project Map 1 of 2 (PDF, 9.8MB)
- Eastside Switchyard Project Map 2 of 2 (PDF, 9.4)
- Eastside Switchyard Project FAQs (English)
- Eastside Switchyard Project FAQs (Spanish)
- Eastside Switchyard Project Questionnaire (English)
- Eastside Switchyard Project Questionnaire (Spanish)
CPS Energy is proposing to construct a new 345/138-kV switching station in east Bexar County near an existing CPS Energy right-of-way. The CPS Energy-owned transmission lines in the existing right-of-way will connect to the new switching station. Additional property is required for the new switching station.
The new switchyard is necessary to support the accelerating growth with new generation resources in The Electric Reliability Council of Texas (ERCOT) system, planned retirement of generation in San Antonio, and increasing customer load growth in San Antonio. ERCOT’s Board of Directors endorsed the project as critical to the reliability of the ERCOT System on April 23, 2024.
You can reach out via phone, letter, or email:
CPS Energy
Oscar Luevanos
Project Manager II
Eastside Switchyard Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-6673
[email protected]