CPS Energy’s offices, customer service centers, and the call center will be closed on Thursday, November 28 and Friday, November 29, 2024 in observance of Thanksgiving. Offices will reopen on Monday, December 2 at 7:45 AM. Customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 anytime. Online services may be conveniently accessed through Manage My Account.
Howard Road to Leon Creek Phase I Transmission Line Project
The Howard Road to Leon Creek Phase I Transmission Line Project consists of rebuilding approximately 3 miles of single circuit 138kV transmission line from the Howard Road Substation to the Leon Creek Substation. The project consists of completely removing and rebuilding the transmission line, foundations. Adding new transmission structures and electrical wires. The current lattice (webbed) structures will be replaced with steel monopoles.
Transmission line infrastructure consists of specially designed structures and wires that move electricity long distances at high voltages from station to station.
The reconstruction of the transmission line is necessary to support the accelerating growth in San Antonio. It will also increase the reliability of Texas’ electric grid by adding another path for electric transmission.
You may call, write, or email:
CPS Energy
Oscar Luevanos,
Project Manager
Howard Road to Leon Creek Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-4504
[email protected]