CPS Energy’s offices, customer service centers, and the call center will be closed on Thursday, November 28 and Friday, November 29, 2024 in observance of Thanksgiving. Offices will reopen on Monday, December 2 at 7:45 AM. Customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 anytime. Online services may be conveniently accessed through Manage My Account.
Howard Rd. Switching Station and Transmission Line Project
The Howard Rd. Switching Station and Transmission Line Project consists of constructing a new switching station and re-routing the existing high-voltage transmission lines in the area. The project involves removing and rebuilding portions of the existing transmission lines including adding new foundations, transmission structures (poles), and electrical wires. Several of the existing lattice (webbed) structures will be replaced with steel poles.
The project will improve the quality and safety of an aging transmission line and help ensure electric reliability in your area.
Our website will include any future updates, if necessary. You may call, write or email me at:
Oscar Luevanos, P.E., EDS Project Manager, S&T Regulatory Support
Howard Rd. Transmission Line
Rebuild Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
210-353-4504
[email protected]