Omicron New 138kV Transmission Line Project
Project Links
- Omicron Project Open House Invite Letter
- Reunión Pública Carta de Invitación de Proyecto Omicron
- Omicron Project Brochure
- Folleto de Proyecto de Transmisión Omicron
- Map of Omicron 138kV Transmission Line Project (PDF, 1.3MB)
- Omicron Project Open House Displays
- Omicron Project FAQs (English)
- Omicron Project FAQs (Spanish)
- Omicron Project Questionnaire (English)
- Omicron Project Questionnaire (Spanish)
- Map of Omicron Project Map- Northern Portion (PDF, 33.8MB)
- Map of Omicron Project Map- Southern Portion (PDF, 31.2MB)
CPS Energy proposes to construct an approximate five-mile 138kV transmission line extension to a new substation (Omicron) in the western part of Bexar County. The line extension will loop into the existing Cagnon to Howard Rd. 138kV transmission line.
The proposed project is needed to increase the load-serving capability of the far western portion of the CPS Energy transmission system to accommodate increasing customer load growth in the area, including new large customer loads.
The Electric Reliability Council of Texas (ERCOT) endorsed this project as a needed transmission system improvement on the CPS Energy system on July 26, 2024.
You may call, write, or email:
CPS Energy
Oscar Luevanos
Project Manager II
Omicron New Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-6673
[email protected]